Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product COTTON HOSIERY
NAICS
n/a
SIC 2252: Hosiery, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 130
Plant Area
n/a
Annual Production 1,500,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $160,191 2,031,653
kWh
Natural Gas $12,888 2,205
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,827 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,827

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,657 $800 $9,657
122,509
kWh
02 2.4133: Use most efficient type of electric motors $430 $1,717 $430
5,569
kWh
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,620 $2,700 $1,620
20,516
kWh
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,470 $5 $2,470
31,360
kWh
05 2.6223: Schedule use of elevators to conserve energy $2,650 $500 $2,650
33,705
kWh
TOTAL RECOMMENDED $16,827 $5,722 $16,827
213,659
kWh
TOTAL IMPLEMENTED $16,827 $5,722 $16,827
213,659
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs