ITAC Assessment: GT0428
ITAC logo
ITAC Assessment: GT0428
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product RIDGE VENTILATION
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range n/a
# of Employees 20
Plant Area
n/a
Annual Production 76,500
pieces
Production Hrs. Annual 2,040
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $27,673 283,118
kWh
Natural Gas $10,320 1,780
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,421 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,421

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $429 - $429
4,396
kWh
-
02 2.3512: De-energize excess transformer capacity $562 $400 $562
5,862
kWh
-
03 2.2437: Recover waste heat from equipment $1,645 $1,500 - $1,645
-
MMBtu
04 2.7141: Lower light fixtures in high ceiling areas $1,170 $2,400 $1,170
12,016
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $317 $839 $317
3,224
kWh
-
06 2.4133: Use most efficient type of electric motors $68 $563 $68
586
kWh
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $70 - $70
879
kWh
-
08 2.7261: Install timers and/or thermostats $1,160 $600 - $1,160
-
MMBtu
TOTAL RECOMMENDED $5,421 $6,302 $2,616
26,963
kWh
$2,805
-
MMBtu
TOTAL IMPLEMENTED $5,421 $6,302 $2,616
26,963
kWh
$2,805
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs