ITAC Assessment: GT0424
ITAC logo
ITAC Assessment: GT0424
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product RUGS AND CARPETS
NAICS
n/a
SIC 2273: Carpets and Rugs
Sales Range $5
M
to 10
M
# of Employees 250
Plant Area
n/a
Annual Production 12,000
thousand feet
Production Hrs. Annual 7,200
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $215,744 3,820,047
kWh
Natural Gas $175,753 33,205
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $68,850 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,300

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings LPG Savings
01 2.8114: Change rate schedules or other changes in utility service $42,680 $90,000 - $50,400
-
MMBtu
$(-7,720.0)
-
MMBtu
02 2.1233: Analyze flue gas for proper air/fuel ratio $2,180 $150 - $2,180
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,300 $2,320 $4,300
76,788
kWh
- -
04 2.4133: Use most efficient type of electric motors $820 $1,000 $820
14,947
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,110 - $2,110
37,515
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $2,000 - $2,000
35,756
kWh
- -
07 2.2443: Re-use or recycle hot or cold process exhaust air $14,760 $10,000 - $14,760
-
MMBtu
-
TOTAL RECOMMENDED $68,850 $103,470 $9,230
165,006
kWh
$67,340
-
MMBtu
$(-7,720.0)
-
MMBtu
TOTAL IMPLEMENTED $7,300 $3,470 $5,120
91,735
kWh
$2,180
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs