Assessment Year | 1990 |
---|---|
Principal Product | STAINLESS FIXTURES |
NAICS |
n/a
|
SIC | 3444: Sheet Metal Work |
Sales Range | $5 M to 10M |
# of Employees | 70 |
Plant Area |
n/a
|
Annual Production | 805,000
lb
|
Production Hrs. Annual | 4,375
hrs
|
Location (State) | South Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $46,758 | 786,049 |
kWh
|
$0.059 |
Natural Gas | $16,654 | 3,012 |
MMBtu
|
$5.53 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $9,279 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,710 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.7141: Lower light fixtures in high ceiling areas | $6,500 | $5,860 |
$6,500
109,320
kWh
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,900 | $3,771 |
$1,900
31,946
kWh
|
|
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $810 | - |
$810
13,482
kWh
|
|
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $37 | - |
$37
586
kWh
|
|
05 | 2.4133: Use most efficient type of electric motors | $32 | $57 |
$32
586
kWh
|
|
TOTAL RECOMMENDED | $9,279 | $9,688 |
$9,279
155,920
kWh
|
||
TOTAL IMPLEMENTED | $2,710 | $3,771 |
$2,710
45,428
kWh
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs