ITAC Assessment: GT0401
ITAC logo
ITAC Assessment: GT0401
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product HEAT SET CARPET YARN
NAICS
n/a
SIC 2281: Yarn Spinning Mills
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area
n/a
Annual Production 14,250,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $623,828 12,514,947
kWh
Natural Gas $235,289 61,109
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,444 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,630

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $20,050 $34,920 $20,050
401,817
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,814 $4,225 $3,814
76,495
kWh
-
03 2.4133: Use most efficient type of electric motors $2,615 $8,720 $2,615
52,462
kWh
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $6,565 $200 - $6,565
-
MMBtu
05 2.6231: Utilize controls to operate equipment only when needed $5,600 $5,000 $5,600
112,837
kWh
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,800 $1,000 $1,800
36,049
kWh
-
TOTAL RECOMMENDED $40,444 $54,065 $33,879
679,660
kWh
$6,565
-
MMBtu
TOTAL IMPLEMENTED $36,630 $49,840 $30,065
603,165
kWh
$6,565
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs