ITAC Assessment: GT0400
ITAC logo
ITAC Assessment: GT0400
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product WOVEN WOOLEN FABRIC
NAICS
n/a
SIC 2231: Broadwoven Fabric Mills, Wool (Including Dyeing and Finishing)
Sales Range $10
M
to 50
M
# of Employees 562
Plant Area
n/a
Annual Production 99,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $899,505 18,923,506
kWh
Natural Gas $406,995 147,241
MMBtu
Fuel Oil #2 $75,191 27,108
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $86,196 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $75,063

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,030 $8,080 $5,030
105,510
kWh
- -
02 2.4133: Use most efficient type of electric motors $1,063 $2,752 $1,063
22,567
kWh
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,520 - $2,520
52,755
kWh
- -
04 2.1221: Replace obsolete burners with more efficient ones $8,103 $5,500 - $6,838
-
MMBtu
$1,265
-
MMBtu
05 2.5192: Modify textile dryers $66,450 - - $66,450
-
MMBtu
-
06 2.2532: Use only amount of air necessary to prevent explosion hazard $3,030 $500 $3,030
64,478
kWh
- -
TOTAL RECOMMENDED $86,196 $16,832 $11,643
245,310
kWh
$73,288
-
MMBtu
$1,265
-
MMBtu
TOTAL IMPLEMENTED $75,063 $10,832 $8,613
180,832
kWh
$66,450
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs