ITAC Assessment: GT0397
ITAC logo
ITAC Assessment: GT0397
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product PRECOOKED MEAT & POULTRY
NAICS
n/a
SIC 2015: Poultry Slaughtering and Processing
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area
n/a
Annual Production 35,000,000
lb
Production Hrs. Annual 6,600
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $547,405 10,182,884
kWh
Natural Gas $252,837 88,561
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,562 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7111: Reduce illumination to minimum necessary levels $409 - $409
7,620
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $7,478 $16,729 $7,478
138,921
kWh
-
03 2.4133: Use most efficient type of electric motors $816 $2,103 $816
15,240
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $569 - $569
10,551
kWh
-
05 2.2136: Install / repair insulation on steam lines $390 $224 - $390
-
MMBtu
06 2.2135: Repair and eliminate steam leaks $2,300 $300 - $2,300
-
MMBtu
07 2.1233: Analyze flue gas for proper air/fuel ratio $1,690 $450 - $1,690
-
MMBtu
08 2.2414: Use waste heat from hot flue gases to preheat $12,910 $15,000 - $12,910
-
MMBtu
TOTAL RECOMMENDED $26,562 $34,806 $9,272
172,332
kWh
$17,290
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs