Assessment Year | 1990 |
---|---|
Principal Product | PRECOOKED MEAT & POULTRY |
NAICS |
n/a
|
SIC | 2015: Poultry Slaughtering and Processing |
Sales Range | $10 M to 50M |
# of Employees | 350 |
Plant Area |
n/a
|
Annual Production | 35,000,000
lb
|
Production Hrs. Annual | 6,600
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $547,405 | 10,182,884 |
kWh
|
$0.054 |
Natural Gas | $252,837 | 88,561 |
MMBtu
|
$2.85 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $26,562 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $409 | - |
$409
7,620
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,478 | $16,729 |
$7,478
138,921
kWh
|
- | |
03 | 2.4133: Use most efficient type of electric motors | $816 | $2,103 |
$816
15,240
kWh
|
- | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $569 | - |
$569
10,551
kWh
|
- | |
05 | 2.2136: Install / repair insulation on steam lines | $390 | $224 | - |
$390
-
MMBtu
|
|
06 | 2.2135: Repair and eliminate steam leaks | $2,300 | $300 | - |
$2,300
-
MMBtu
|
|
07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,690 | $450 | - |
$1,690
-
MMBtu
|
|
08 | 2.2414: Use waste heat from hot flue gases to preheat | $12,910 | $15,000 | - |
$12,910
-
MMBtu
|
|
TOTAL RECOMMENDED | $26,562 | $34,806 |
$9,272
172,332
kWh
|
$17,290
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs