| Assessment Year | 1990 |
|---|---|
| Principal Product | PRECOOKED MEAT & POULTRY |
| NAICS |
n/a
|
| SIC | 2015: Poultry Slaughtering and Processing |
| Sales Range | $10 M to 50M |
| # of Employees | 350 |
| Plant Area |
n/a
|
| Annual Production | 35,000,000
lb
|
| Production Hrs. Annual | 6,600
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $547,405 | 10,182,884 |
kWh
|
$0.054 |
| Natural Gas | $252,837 | 88,561 |
MMBtu
|
$2.85 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $26,562 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7111: Reduce illumination to minimum necessary levels | $409 | - |
$409
7,620
kWh
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,478 | $16,729 |
$7,478
138,921
kWh
|
- | |
| 03 | 2.4133: Use most efficient type of electric motors | $816 | $2,103 |
$816
15,240
kWh
|
- | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $569 | - |
$569
10,551
kWh
|
- | |
| 05 | 2.2136: Install / repair insulation on steam lines | $390 | $224 | - |
$390
-
MMBtu
|
|
| 06 | 2.2135: Repair and eliminate steam leaks | $2,300 | $300 | - |
$2,300
-
MMBtu
|
|
| 07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,690 | $450 | - |
$1,690
-
MMBtu
|
|
| 08 | 2.2414: Use waste heat from hot flue gases to preheat | $12,910 | $15,000 | - |
$12,910
-
MMBtu
|
|
| TOTAL RECOMMENDED | $26,562 | $34,806 |
$9,272
172,332
kWh
|
$17,290
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs