Assessment Year | 1989 |
---|---|
Principal Product | STICK CANDY |
NAICS |
n/a
|
SIC | 2064: Candy and Other Confectionery Products |
Sales Range | $10 M to 50M |
# of Employees | 395 |
Plant Area |
n/a
|
Annual Production | 28,000,000
lb
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $342,740 | 6,647,714 |
kWh
|
$0.052 |
Natural Gas | $68,004 | 14,605 |
MMBtu
|
$4.66 |
Fuel Oil #2 | $189,612 | 50,610 |
MMBtu
|
$3.75 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $120,786 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $118,645 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.8113: Purchase gas directly from a contract gas supplier | $109,711 | - | - |
$109,711
-
MMBtu
|
- | |
02 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $2,141 | $5,000 | - |
$569
-
MMBtu
|
$1,572
-
MMBtu
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,918 | $6,340 |
$1,918
37,222
kWh
|
- | - | |
04 | 2.2136: Install / repair insulation on steam lines | $647 | $1,517 | - |
$171
-
MMBtu
|
$476
-
MMBtu
|
|
05 | 2.4133: Use most efficient type of electric motors | $260 | $1,060 |
$260
4,982
kWh
|
- | - | |
06 | 2.2414: Use waste heat from hot flue gases to preheat | $6,109 | $7,140 | - |
$1,615
-
MMBtu
|
$4,494
-
MMBtu
|
|
TOTAL RECOMMENDED | $120,786 | $21,057 |
$2,178
42,204
kWh
|
$112,066
-
MMBtu
|
$6,542
-
MMBtu
|
||
TOTAL IMPLEMENTED | $118,645 | $16,057 |
$2,178
42,204
kWh
|
$111,497
-
MMBtu
|
$4,970
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs