ITAC Assessment: GT0394
ITAC logo
ITAC Assessment: GT0394
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product STICK CANDY
NAICS
n/a
SIC 2064: Candy and Other Confectionery Products
Sales Range $10
M
to 50
M
# of Employees 395
Plant Area
n/a
Annual Production 28,000,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $342,740 6,647,714
kWh
Natural Gas $68,004 14,605
MMBtu
Fuel Oil #2 $189,612 50,610
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $120,786 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $118,645

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.8113: Purchase gas directly from a contract gas supplier $109,711 - - $109,711
-
MMBtu
-
02 2.1243: Use heat from boiler blowdown to preheat boiler feed water $2,141 $5,000 - $569
-
MMBtu
$1,572
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,918 $6,340 $1,918
37,222
kWh
- -
04 2.2136: Install / repair insulation on steam lines $647 $1,517 - $171
-
MMBtu
$476
-
MMBtu
05 2.4133: Use most efficient type of electric motors $260 $1,060 $260
4,982
kWh
- -
06 2.2414: Use waste heat from hot flue gases to preheat $6,109 $7,140 - $1,615
-
MMBtu
$4,494
-
MMBtu
TOTAL RECOMMENDED $120,786 $21,057 $2,178
42,204
kWh
$112,066
-
MMBtu
$6,542
-
MMBtu
TOTAL IMPLEMENTED $118,645 $16,057 $2,178
42,204
kWh
$111,497
-
MMBtu
$4,970
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs