ITAC Assessment: GT0203
ITAC logo
ITAC Assessment: GT0203
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product BEEF
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $50
M
to 100
M
# of Employees 208
Plant Area
n/a
Annual Production 50,000,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $344,117 7,684,936
kWh
Natural Gas $166,585 31,632
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,150 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,310

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $2,089 $250 - $2,089
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,957 $4,500 $3,957
90,856
kWh
-
03 2.4133: Use most efficient type of electric motors $5,914 $37,000 $5,914
135,991
kWh
-
04 2.3191: Use demand controller or load shedder $7,310 $9,000 $7,310
-
kWh
-
05 2.2443: Re-use or recycle hot or cold process exhaust air $8,380 $12,500 - $8,380
-
MMBtu
06 2.2443: Re-use or recycle hot or cold process exhaust air $8,500 $14,000 $8,500
195,193
kWh
-
TOTAL RECOMMENDED $36,150 $77,250 $25,681
422,040
kWh
$10,469
-
MMBtu
TOTAL IMPLEMENTED $7,310 $9,000 $7,310
-
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs