ITAC Assessment: GT0375
ITAC logo
ITAC Assessment: GT0375
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product SOFT DRINKS
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area
n/a
Annual Production 13,000,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $270,830 4,279,895
kWh
Natural Gas $86,001 18,337
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,937 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,197

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2211: Use optimum temperature $6,400 $2,350 - $400
-
MMBtu
$6,000
02 2.2122: Install / repair insulation on condensate lines $2,289 $2,366 $704
11,137
kWh
$1,585
-
MMBtu
-
03 2.2444: Use hot process fluids to preheat incoming process fluids $17,740 $37,400 - $17,740
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $90 $206 $90
1,465
kWh
- -
05 2.5193: Convert from batch to continuous operation $988 $1,078 $988
15,826
kWh
- -
06 2.1233: Analyze flue gas for proper air/fuel ratio $1,430 $500 - $1,730
-
MMBtu
$(-300.0)
TOTAL RECOMMENDED $28,937 $43,900 $1,782
28,428
kWh
$21,455
-
MMBtu
$5,700
TOTAL IMPLEMENTED $11,197 $6,500 $1,782
28,428
kWh
$3,715
-
MMBtu
$5,700
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs