Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product MEAT PACKAGING
NAICS
n/a
SIC 2011: Meat Packing Plants
Sales Range $1
M
to 5
M
# of Employees 12
Plant Area
n/a
Annual Production 22,000
lb
Production Hrs. Annual 2,340
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,509 317,995
kWh
Natural Gas $5,903 1,231
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,030 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,008

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2136: Install / repair insulation on steam lines $581 $184 - $581
-
MMBtu
02 2.6218: Turn off equipment when not in use $1,590 $200 $1,590
21,395
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $297 $618 $297
4,103
kWh
-
04 2.2135: Repair and eliminate steam leaks $540 $150 - $540
-
MMBtu
05 2.4133: Use most efficient type of electric motors $22 $200 $22
293
kWh
-
TOTAL RECOMMENDED $3,030 $1,352 $1,909
25,791
kWh
$1,121
-
MMBtu
TOTAL IMPLEMENTED $3,008 $1,152 $1,887
25,498
kWh
$1,121
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs