ITAC Assessment: GT0373
ITAC logo
ITAC Assessment: GT0373
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product WOVEN FABRIC
NAICS
n/a
SIC 2211: Broadwoven Fabric Mills, Cotton
Sales Range $10
M
to 50
M
# of Employees 92
Plant Area
n/a
Annual Production 37,500
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $379,243 9,477,140
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,041 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,741

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,521 $4,413 $2,521
63,013
kWh
02 2.4133: Use most efficient type of electric motors $670 $3,438 $670
16,706
kWh
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,920 $4,370 $5,920
148,007
kWh
04 2.4312: Improve lubrication practices $550 - $550
13,775
kWh
05 2.4231: Reduce the pressure of compressed air to the minimum required $3,380 - $3,380
84,408
kWh
TOTAL RECOMMENDED $13,041 $12,221 $13,041
325,909
kWh
TOTAL IMPLEMENTED $3,741 $7,851 $3,741
93,494
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs