ITAC Assessment: GT0364
ITAC logo
ITAC Assessment: GT0364
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product PARTICLE BOARD
NAICS
n/a
SIC 2493: Reconstituted Wood Products
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area
n/a
Annual Production 100,000
thousand feet
Production Hrs. Annual 8,736
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,166,911 27,288,101
kWh
Natural Gas $28,602 8,116
MMBtu
Fuel Oil #6 $19,111 7,600
MMBtu
Wood $69,831 139,664
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,239 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,137

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Wood Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $74 $150 $74
1,758
kWh
- -
02 2.4312: Improve lubrication practices $2,630 - $2,630
61,547
kWh
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,433 - $5,433
126,319
kWh
- -
04 2.3411: Replace electric motors with back pressure steam turbines and use exhaust steam for process heat $19,102 $28,000 $27,040
755,862
kWh
$(-33,075.0)
-
MMBtu
$25,137
TOTAL RECOMMENDED $27,239 $28,150 $35,177
945,486
kWh
$(-33,075.0)
-
MMBtu
$25,137
TOTAL IMPLEMENTED $8,137 $150 $8,137
189,624
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs