ITAC Assessment: GT0363
ITAC logo
ITAC Assessment: GT0363
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product DRILL BITS
NAICS
n/a
SIC 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices
Sales Range $5
M
to 10
M
# of Employees 550
Plant Area
n/a
Annual Production 750,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $843,651 16,826,495
kWh
Natural Gas $27,561 5,061
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $95,350 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $2,945 $200 $2,945
58,910
kWh
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $380 $370 $380
8,206
kWh
03 2.7229: Air condition only space necessary $930 $840 $930
42,204
kWh
04 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $12,120 $4,685 $12,120
550,996
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $472 $377 $472
5,862
kWh
06 2.3191: Use demand controller or load shedder $66,800 $45,607 $66,800
574,443
kWh
07 2.2614: Use cooling tower or economizer to replace chiller cooling $11,540 $32,000 $11,540
274,033
kWh
08 2.4133: Use most efficient type of electric motors $163 $150 $163
3,224
kWh
TOTAL RECOMMENDED $95,350 $84,229 $95,350
1,517,878
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs