ITAC Assessment: GT0360
ITAC logo
ITAC Assessment: GT0360
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product ELECTROMECHANICAL COMPONENTS
NAICS
n/a
SIC 3625: Relays and Industrial Controls
Sales Range $5
M
to 10
M
# of Employees 120
Plant Area
n/a
Annual Production 2,000,000
pieces
Production Hrs. Annual 4,990
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $99,201 1,320,047
kWh
Natural Gas $1,686 300
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,921 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,701

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,520 - $2,520
-
kWh
02 2.7226: Use computer programs to optimize hvac performance $3,950 $1,800 $3,950
122,509
kWh
03 2.7122: Disconnect ballasts $210 $230 $210
2,638
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $7,741 $21,965 $7,741
102,872
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,010 $2,080 $1,010
13,482
kWh
06 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $490 $500 $490
6,448
kWh
TOTAL RECOMMENDED $15,921 $26,575 $15,921
247,949
kWh
TOTAL IMPLEMENTED $14,701 $24,265 $14,701
231,829
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs