ITAC Assessment: GT0356
ITAC logo
ITAC Assessment: GT0356
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product WOVEN FABRIC
NAICS
n/a
SIC 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area
n/a
Annual Production 192,000
thousand feet
Production Hrs. Annual 6,600
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $711,311 19,533,998
kWh
Natural Gas $76,549 24,944
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $60,511 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,569

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,680 $32,200 $11,680
243,259
kWh
-
02 2.4133: Use most efficient type of electric motors $3,342 $3,313 $3,342
69,754
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,859 $8,805 $5,859
121,923
kWh
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $1,430 $1,000 - $1,430
-
MMBtu
05 2.4312: Improve lubrication practices $10,600 $1,830 $10,600
220,692
kWh
-
06 2.7226: Use computer programs to optimize hvac performance $27,600 $10,000 $27,600
787,515
kWh
-
TOTAL RECOMMENDED $60,511 $57,148 $59,081
1,443,143
kWh
$1,430
-
MMBtu
TOTAL IMPLEMENTED $29,569 $43,835 $28,139
585,874
kWh
$1,430
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs