ITAC Assessment: GT0345
ITAC logo
ITAC Assessment: GT0345
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product MEN'S COATS
NAICS
n/a
SIC 2311: Men's and Boys' Suits, Coats, and Overcoats
Sales Range $10
M
to 50
M
# of Employees 240
Plant Area
n/a
Annual Production 1,020,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $162,265 2,135,111
kWh
Natural Gas $21,971 3,899
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,070 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,220

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $12,120 $28,140 $12,120
159,437
kWh
- -
02 2.4133: Use most efficient type of electric motors $400 $180 $400
5,275
kWh
- -
03 2.2136: Install / repair insulation on steam lines $640 $425 - $640
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,060 $40 $1,060
14,068
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $4,366 - $4,366
57,444
kWh
- -
06 2.7226: Use computer programs to optimize hvac performance $3,450 $2,750 $3,450
76,495
kWh
- -
07 2.7291: Reschedule and rearrange multiple-source heating systems $4,034 $1,000 - $10,990
-
MMBtu
$(-6,956.0)
-
MMBtu
TOTAL RECOMMENDED $26,070 $32,535 $21,396
312,719
kWh
$11,630
-
MMBtu
$(-6,956.0)
-
MMBtu
TOTAL IMPLEMENTED $14,220 $28,785 $13,580
178,780
kWh
$640
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs