ITAC Assessment: GT0340
ITAC logo
ITAC Assessment: GT0340
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product AUTOMOTIVE EXTERIOR TRIM
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area
n/a
Annual Production 4,800,000
pieces
Production Hrs. Annual 4,335
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $108,425 1,504,103
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,613 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,823

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.2437: Recover waste heat from equipment $1,410 $1,640 $1,410
23,154
kWh
02 2.7226: Use computer programs to optimize hvac performance $2,580 $1,000 $2,580
42,204
kWh
03 2.2511: Insulate bare equipment $320 $160 $320
5,275
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,790 $12,930 $6,790
94,080
kWh
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,300 $1,800 $1,300
21,395
kWh
06 2.4133: Use most efficient type of electric motors $213 $237 $213
3,517
kWh
TOTAL RECOMMENDED $12,613 $17,767 $12,613
189,625
kWh
TOTAL IMPLEMENTED $5,823 $4,837 $5,823
95,545
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs