ITAC Assessment: GT0334
ITAC logo
ITAC Assessment: GT0334
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product DYED YARN
NAICS
n/a
SIC 2269: Finishers of Textiles, Not elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area
n/a
Annual Production 1,200,000
lb
Production Hrs. Annual 4,080
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $17,172 298,066
kWh
Natural Gas $83,904 16,422
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,011 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,842

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $1,890 $250 - $1,890
-
MMBtu
02 2.2136: Install / repair insulation on steam lines $5,219 $1,778 - $5,219
-
MMBtu
03 2.2511: Insulate bare equipment $1,083 $2,200 - $1,083
-
MMBtu
04 2.5191: Modify dye beck $3,166 $1,350 - $3,166
-
MMBtu
05 2.5191: Modify dye beck $2,902 $2,300 - $2,902
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $184 $57 $184
3,224
kWh
-
07 2.4133: Use most efficient type of electric motors $466 $541 $466
8,206
kWh
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,101 - $1,101
19,050
kWh
-
TOTAL RECOMMENDED $16,011 $8,476 $1,751
30,480
kWh
$14,260
-
MMBtu
TOTAL IMPLEMENTED $11,842 $3,919 $1,567
27,256
kWh
$10,275
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs