ITAC Assessment: GT0326
ITAC logo
ITAC Assessment: GT0326
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product METAL CABINETS& DISPLAYS
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $5
M
to 10
M
# of Employees 120
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,000
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $79,941 1,337,046
kWh
Natural Gas $30,095 9,253
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,404 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,622

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7123: Keep lamps and reflectors clean $1,390 $1,577 $1,390
24,033
kWh
-
02 2.4133: Use most efficient type of electric motors $92 $40 $92
1,465
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,700 $1,050 $1,700
29,308
kWh
-
04 2.2422: Use waste heat from hot flue gases to generate steam $458 $3,000 - $458
-
MMBtu
05 2.2531: Re-size charging openings or add movable cover or door $1,320 $480 - $1,320
-
MMBtu
06 2.2531: Re-size charging openings or add movable cover or door $1,440 $500 - $1,440
-
MMBtu
07 2.8114: Change rate schedules or other changes in utility service $3,004 $5,000 $3,004
-
kWh
-
TOTAL RECOMMENDED $9,404 $11,647 $6,186
54,806
kWh
$3,218
-
MMBtu
TOTAL IMPLEMENTED $4,622 $3,167 $3,182
54,806
kWh
$1,440
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs