ITAC Assessment: GT0319
ITAC logo
ITAC Assessment: GT0319
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product MARGARINE
NAICS
n/a
SIC 2079: Shortening, Table Oils, Margarine, and Other Edible Fats and Oils, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 225
Plant Area
n/a
Annual Production 161,000
lb
Production Hrs. Annual 4,800
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $406,931 5,815,944
kWh
Natural Gas $94,573 19,485
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,843 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,480

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $2,910 $300 - $2,910
-
MMBtu
-
02 2.2163: Use minimum steam operating pressure $850 - - $850
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,990 $2,430 $1,990
28,722
kWh
- -
04 2.2121: Increase amount of condensate returned $8,110 $4,400 - $4,610
-
MMBtu
$3,500
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $13,200 $12,400 $13,200
189,039
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $19,500 $39,600 $19,500
276,084
kWh
- -
07 2.4133: Use most efficient type of electric motors $2,483 $3,725 $2,483
35,463
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,770 $8,290 $2,770
39,566
kWh
- -
09 2.2414: Use waste heat from hot flue gases to preheat $5,030 $15,000 - $5,030
-
MMBtu
-
TOTAL RECOMMENDED $56,843 $86,145 $39,943
568,874
kWh
$13,400
-
MMBtu
$3,500
TOTAL IMPLEMENTED $48,480 $67,420 $37,460
533,411
kWh
$7,520
-
MMBtu
$3,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs