ITAC Assessment: GT0317
ITAC logo
ITAC Assessment: GT0317
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product CORR SHIPPING CONTAINERS
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 155
Plant Area
n/a
Annual Production 1,000,000,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $288,561 5,667,937
kWh
Natural Gas $230,794 57,085
MMBtu
Fuel Oil #2 $5,038 1,078
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,510 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,774

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,870 $40,461 $10,870
213,658
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,989 $6,975 $5,989
117,526
kWh
-
03 2.4133: Use most efficient type of electric motors $866 $691 $866
16,999
kWh
-
04 2.2136: Install / repair insulation on steam lines $3,745 $4,100 - $3,745
-
MMBtu
05 2.2135: Repair and eliminate steam leaks $1,040 $200 - $1,040
-
MMBtu
TOTAL RECOMMENDED $22,510 $52,427 $17,725
348,183
kWh
$4,785
-
MMBtu
TOTAL IMPLEMENTED $10,774 $11,275 $5,989
117,526
kWh
$4,785
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs