ITAC Assessment: GT0294
ITAC logo
ITAC Assessment: GT0294
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product AUOTOMOTIVE COMPONENTS
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 490
Plant Area
n/a
Annual Production 1,380,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $826,534 18,609,027
kWh
Natural Gas $527,865 99,217
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $117,146 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $117,146

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $1,616 $1,866 $1,616
36,635
kWh
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,278 $218 $5,278
118,699
kWh
- - -
03 2.1233: Analyze flue gas for proper air/fuel ratio $4,183 $300 - - $5,183
-
MMBtu
$(-1,000.0)
04 2.1333: Convert combustion equipment to burn oil $56,269 - - $159,375
-
MMBtu
$(-103,106.0)
-
MMBtu
-
05 2.2212: Use minimum safe oven ventilation $46,250 $10,000 - $46,250
-
MMBtu
- -
06 2.2443: Re-use or recycle hot or cold process exhaust air $3,550 $8,000 - - $3,550
-
MMBtu
-
TOTAL RECOMMENDED $117,146 $20,384 $6,894
155,334
kWh
$205,625
-
MMBtu
$(-94,373.0)
-
MMBtu
$(-1,000.0)
TOTAL IMPLEMENTED $117,146 $20,384 $6,894
155,334
kWh
$205,625
-
MMBtu
$(-94,373.0)
-
MMBtu
$(-1,000.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings Administrative Changes Savings