ITAC Assessment: GT0292
ITAC logo
ITAC Assessment: GT0292
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product INFANT/CHILDREN UNDERWR.
NAICS
n/a
SIC 2254: Knit Underwear and Nightwear Mills
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area
n/a
Annual Production 3,000,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $162,142 2,876,905
kWh
Natural Gas $205,930 40,222
MMBtu
LPG $945 247
MMBtu
Fuel Oil #2 $2,021 1,048
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,677 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,677

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $6,500 - - - $6,500
02 2.2443: Re-use or recycle hot or cold process exhaust air $18,800 $15,000 - $18,800
-
MMBtu
-
03 2.7111: Reduce illumination to minimum necessary levels $260 $780 $260
4,689
kWh
- -
04 2.2444: Use hot process fluids to preheat incoming process fluids $15,300 $22,400 - $15,300
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $6,750 $14,700 $6,750
123,974
kWh
- -
06 2.4322: Use or replace with energy efficient substitutes $517 $1,993 $517
9,379
kWh
- -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,550 $1,920 $1,550
27,550
kWh
- -
TOTAL RECOMMENDED $49,677 $56,793 $9,077
165,592
kWh
$34,100
-
MMBtu
$6,500
TOTAL IMPLEMENTED $49,677 $56,793 $9,077
165,592
kWh
$34,100
-
MMBtu
$6,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs