ITAC Assessment: GT0290
ITAC logo
ITAC Assessment: GT0290
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product ELECTRIC METERS
NAICS
n/a
SIC 3825: Instruments for Measuring and Testing of Electricity and Electrical Signals
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 100,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $116,488 1,490,914
kWh
Natural Gas $3,918 635
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,619 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,619

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3191: Use demand controller or load shedder $8,798 $12,000 $8,798
-
kWh
02 2.7111: Reduce illumination to minimum necessary levels $636 - $636
8,206
kWh
03 2.4312: Improve lubrication practices $185 $64 $185
2,345
kWh
TOTAL RECOMMENDED $9,619 $12,064 $9,619
10,551
kWh
TOTAL IMPLEMENTED $9,619 $12,064 $9,619
10,551
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs