ITAC Assessment: GT0288
ITAC logo
ITAC Assessment: GT0288
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product CARPET YARN
NAICS
n/a
SIC 2281: Yarn Spinning Mills
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area
n/a
Annual Production 8,566,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $477,389 11,521,688
kWh
Natural Gas $20,322 4,565
MMBtu
Fuel Oil #6 $158,952 36,620
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $108,712 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $100,942

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings
01 2.4133: Use most efficient type of electric motors $14,924 $28,900 $14,924
364,302
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,548 $4,285 $1,548
37,808
kWh
- -
03 2.1233: Analyze flue gas for proper air/fuel ratio $6,000 $1,000 - $690
-
MMBtu
$5,310
-
MMBtu
04 2.5194: Redesign process $64,500 $114,000 - $7,418
-
MMBtu
$57,082
-
MMBtu
05 2.4312: Improve lubrication practices $7,770 - $7,770
187,573
kWh
- -
06 2.2711: Utilize outside air instead of conditioned air for drying $13,970 $20,000 $13,970
340,563
kWh
- -
TOTAL RECOMMENDED $108,712 $168,185 $38,212
930,246
kWh
$8,108
-
MMBtu
$62,392
-
MMBtu
TOTAL IMPLEMENTED $100,942 $168,185 $30,442
742,673
kWh
$8,108
-
MMBtu
$62,392
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs