| Assessment Year | 1986 |
|---|---|
| Principal Product | WOVEN CARPET |
| NAICS |
n/a
|
| SIC | 2273: Carpets and Rugs |
| Sales Range | $10 M to 50M |
| # of Employees | 350 |
| Plant Area |
n/a
|
| Annual Production | 42,030
thousand feet
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | South Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $340,956 | 7,543,083 |
kWh
|
$0.045 |
| Fuel Oil #6 | $257,435 | 56,909 |
MMBtu
|
$4.52 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $88,608 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $46,000 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #6 Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $426 | $608 |
$426
9,379
kWh
|
- | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,279 | $5,745 |
$2,279
50,703
kWh
|
- | |
| 03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $16,719 | $1,000 | - |
$16,719
-
MMBtu
|
|
| 04 | 2.5192: Modify textile dryers | $7,960 | $1,000 | - |
$7,960
-
MMBtu
|
|
| 05 | 2.6124: Establish equipment maintenance schedule | $2,720 | $500 |
$2,720
60,375
kWh
|
- | |
| 06 | 2.7226: Use computer programs to optimize hvac performance | $14,400 | $10,000 |
$14,400
319,754
kWh
|
- | |
| 07 | 2.4322: Use or replace with energy efficient substitutes | $34,648 | - |
$(-3,935.0)
(-87,632)
kWh
|
$38,583
-
MMBtu
|
|
| 08 | 2.2414: Use waste heat from hot flue gases to preheat | $9,456 | $35,000 | - |
$9,456
-
MMBtu
|
|
| TOTAL RECOMMENDED | $88,608 | $53,853 |
$15,890
352,579
kWh
|
$72,718
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $46,000 | $52,853 |
$19,825
440,211
kWh
|
$26,175
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #6 Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs