ITAC Assessment: GT0287
ITAC logo
ITAC Assessment: GT0287
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product WOVEN CARPET
NAICS
n/a
SIC 2273: Carpets and Rugs
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area
n/a
Annual Production 42,030
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $340,956 7,543,083
kWh
Fuel Oil #6 $257,435 56,909
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $88,608 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,000

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #6 Savings
01 2.4133: Use most efficient type of electric motors $426 $608 $426
9,379
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,279 $5,745 $2,279
50,703
kWh
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $16,719 $1,000 - $16,719
-
MMBtu
04 2.5192: Modify textile dryers $7,960 $1,000 - $7,960
-
MMBtu
05 2.6124: Establish equipment maintenance schedule $2,720 $500 $2,720
60,375
kWh
-
06 2.7226: Use computer programs to optimize hvac performance $14,400 $10,000 $14,400
319,754
kWh
-
07 2.4322: Use or replace with energy efficient substitutes $34,648 - $(-3,935.0)
(-87,632)
kWh
$38,583
-
MMBtu
08 2.2414: Use waste heat from hot flue gases to preheat $9,456 $35,000 - $9,456
-
MMBtu
TOTAL RECOMMENDED $88,608 $53,853 $15,890
352,579
kWh
$72,718
-
MMBtu
TOTAL IMPLEMENTED $46,000 $52,853 $19,825
440,211
kWh
$26,175
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #6 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs