ITAC Assessment: GT0286
ITAC logo
ITAC Assessment: GT0286
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product COTTON AND BLEND YARN
NAICS
n/a
SIC 2281: Yarn Spinning Mills
Sales Range $10
M
to 50
M
# of Employees 550
Plant Area
n/a
Annual Production 14,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,834,720 38,344,080
kWh
Natural Gas $103,074 23,288
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $200,324 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $126,791

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $15,600 $16,800 $15,600
325,322
kWh
- -
02 2.4133: Use most efficient type of electric motors $18,333 $24,693 $18,333
382,767
kWh
- -
03 2.4322: Use or replace with energy efficient substitutes $5,375 $5,833 $5,375
111,958
kWh
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $6,190 $1,000 - $6,190
-
MMBtu
-
05 2.4312: Improve lubrication practices $38,200 - $38,200
796,307
kWh
- -
06 2.7221: Lower temperature during the winter season and vice-versa $44,800 - $44,800
932,005
kWh
- -
07 2.7226: Use computer programs to optimize hvac performance $55,200 $15,000 $55,200
1,148,886
kWh
- -
08 2.1333: Convert combustion equipment to burn oil $16,626 $5,000 - $81,575
-
MMBtu
$(-64,949.0)
-
MMBtu
TOTAL RECOMMENDED $200,324 $68,326 $177,508
3,697,245
kWh
$87,765
-
MMBtu
$(-64,949.0)
-
MMBtu
TOTAL IMPLEMENTED $126,791 $28,633 $103,975
2,165,592
kWh
$87,765
-
MMBtu
$(-64,949.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs