ITAC Assessment: GT0284
ITAC logo
ITAC Assessment: GT0284
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product WIRE
NAICS
n/a
SIC 3496: Miscellaneous Fabricated Wire Products
Sales Range $1
M
to 5
M
# of Employees 33
Plant Area
n/a
Annual Production 3,200,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,981 1,342,907
kWh
Natural Gas $89,208 15,373
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,494 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,002

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2514: Cover open tanks $48,372 $11,000 - $48,372
-
MMBtu
02 2.2511: Insulate bare equipment $3,120 $2,388 - $3,120
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,002 $184 $1,002
20,809
kWh
-
TOTAL RECOMMENDED $52,494 $13,572 $1,002
20,809
kWh
$51,492
-
MMBtu
TOTAL IMPLEMENTED $1,002 $184 $1,002
20,809
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs