Assessment Year | 1986 |
---|---|
Principal Product | ALUMINUM CASTINGS |
NAICS |
n/a
|
SIC | 3363: Aluminum Die-Castings |
Sales Range | $5 M to 10M |
# of Employees | 150 |
Plant Area |
n/a
|
Annual Production | 4,200,000
lb
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $180,284 | 3,417,057 |
kWh
|
$0.053 |
Natural Gas | $467,980 | 78,610 |
MMBtu
|
$5.95 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $75,606 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,843 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,498 | $44,880 |
$9,498
163,247
kWh
|
- | |
02 | 2.4133: Use most efficient type of electric motors | $664 | $761 |
$664
12,896
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $76 | $64 |
$76
1,465
kWh
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,605 | $540 |
$2,605
50,703
kWh
|
- | |
05 | 2.2414: Use waste heat from hot flue gases to preheat | $62,763 | $20,000 | - |
$62,763
-
MMBtu
|
|
TOTAL RECOMMENDED | $75,606 | $66,245 |
$12,843
228,311
kWh
|
$62,763
-
MMBtu
|
||
TOTAL IMPLEMENTED | $12,843 | $46,245 |
$12,843
228,311
kWh
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs