ITAC Assessment: GT0283
ITAC logo
ITAC Assessment: GT0283
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product ALUMINUM CASTINGS
NAICS
n/a
SIC 3363: Aluminum Die-Castings
Sales Range $5
M
to 10
M
# of Employees 150
Plant Area
n/a
Annual Production 4,200,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $180,284 3,417,057
kWh
Natural Gas $467,980 78,610
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $75,606 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,843

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,498 $44,880 $9,498
163,247
kWh
-
02 2.4133: Use most efficient type of electric motors $664 $761 $664
12,896
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $76 $64 $76
1,465
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,605 $540 $2,605
50,703
kWh
-
05 2.2414: Use waste heat from hot flue gases to preheat $62,763 $20,000 - $62,763
-
MMBtu
TOTAL RECOMMENDED $75,606 $66,245 $12,843
228,311
kWh
$62,763
-
MMBtu
TOTAL IMPLEMENTED $12,843 $46,245 $12,843
228,311
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs