| Assessment Year | 1986 |
|---|---|
| Principal Product | FROZEN MEAT PRODUCTS |
| NAICS |
n/a
|
| SIC | 2013: Sausages and Other Prepared Meat Products |
| Sales Range | $50 M to 100M |
| # of Employees | 180 |
| Plant Area |
n/a
|
| Annual Production | 25,000,000
lb
|
| Production Hrs. Annual | 5,500
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $339,490 | 6,817,116 |
kWh
|
$0.050 |
| Natural Gas | $236,660 | 40,900 |
MMBtu
|
$5.79 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $38,359 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $34,749 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2444: Use hot process fluids to preheat incoming process fluids | $15,230 | $7,500 | - |
$15,230
-
MMBtu
|
|
| 02 | 2.2447: Heat water with exhaust heat | $2,590 | $4,000 | - |
$2,590
-
MMBtu
|
|
| 03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $12,720 | $500 | - |
$12,720
-
MMBtu
|
|
| 04 | 2.2136: Install / repair insulation on steam lines | $1,270 | $1,460 | - |
$1,270
-
MMBtu
|
|
| 05 | 2.2122: Install / repair insulation on condensate lines | $203 | $320 | - |
$203
-
MMBtu
|
|
| 06 | 2.2511: Insulate bare equipment | $1,020 | $700 | - |
$1,020
-
MMBtu
|
|
| 07 | 2.2514: Cover open tanks | $156 | - | - |
$156
-
MMBtu
|
|
| 08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,880 | $1,330 |
$1,880
37,808
kWh
|
- | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,020 | $2,870 |
$2,020
40,739
kWh
|
- | |
| 10 | 2.4133: Use most efficient type of electric motors | $1,270 | $4,900 |
$1,270
25,498
kWh
|
- | |
| TOTAL RECOMMENDED | $38,359 | $23,580 |
$5,170
104,045
kWh
|
$33,189
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $34,749 | $18,880 |
$5,170
104,045
kWh
|
$29,579
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs