ITAC Assessment: GT0273
ITAC logo
ITAC Assessment: GT0273
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product MEN'S COATS
NAICS
n/a
SIC 2311: Men's and Boys' Suits, Coats, and Overcoats
Sales Range $1
M
to 5
M
# of Employees 350
Plant Area
n/a
Annual Production 316,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $136,076 1,971,864
kWh
Natural Gas $41,767 6,700
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,449 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,449

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,310 $248 $4,310
62,427
kWh
-
02 2.2136: Install / repair insulation on steam lines $1,390 $865 - $1,390
-
MMBtu
03 2.4133: Use most efficient type of electric motors $239 $339 $239
3,517
kWh
-
04 2.7226: Use computer programs to optimize hvac performance $4,940 $20,000 $4,940
71,512
kWh
-
05 2.3191: Use demand controller or load shedder $2,570 $1,000 $2,570
-
kWh
-
TOTAL RECOMMENDED $13,449 $22,452 $12,059
137,456
kWh
$1,390
-
MMBtu
TOTAL IMPLEMENTED $13,449 $22,452 $12,059
137,456
kWh
$1,390
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs