ITAC Assessment: GT0266
ITAC logo
ITAC Assessment: GT0266
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product TIRES & WHEELS
NAICS
n/a
SIC 3011: Tires and Inner Tubes
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 20,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $368,440 6,818,875
kWh
Natural Gas $223,764 51,737
MMBtu
Fuel Oil #2 $17,199 2,940
MMBtu
Fuel Oil #4 $15,431 2,448
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $68,298 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $68,298

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6232: Install set-back timers $5,053 $3,000 $5,053
93,494
kWh
-
02 2.2121: Increase amount of condensate returned $21,278 $20,000 - $21,278
-
MMBtu
03 2.2135: Repair and eliminate steam leaks $6,345 $300 - $6,345
-
MMBtu
04 2.2136: Install / repair insulation on steam lines $2,960 $528 - $2,960
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $20,085 $6,000 $20,085
371,630
kWh
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $12,577 - $12,577
232,708
kWh
-
TOTAL RECOMMENDED $68,298 $29,828 $37,715
697,832
kWh
$30,583
-
MMBtu
TOTAL IMPLEMENTED $68,298 $29,828 $37,715
697,832
kWh
$30,583
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs