Assessment Year | 1985 |
---|---|
Principal Product | TIRES & WHEELS |
NAICS |
n/a
|
SIC | 3011: Tires and Inner Tubes |
Sales Range | $10 M to 50M |
# of Employees | 300 |
Plant Area |
n/a
|
Annual Production | 20,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $368,440 | 6,818,875 |
kWh
|
$0.054 |
Natural Gas | $223,764 | 51,737 |
MMBtu
|
$4.33 |
Fuel Oil #2 | $17,199 | 2,940 |
MMBtu
|
$5.85 |
Fuel Oil #4 | $15,431 | 2,448 |
MMBtu
|
$6.30 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $68,298 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $68,298 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.6232: Install set-back timers | $5,053 | $3,000 |
$5,053
93,494
kWh
|
- | |
02 | 2.2121: Increase amount of condensate returned | $21,278 | $20,000 | - |
$21,278
-
MMBtu
|
|
03 | 2.2135: Repair and eliminate steam leaks | $6,345 | $300 | - |
$6,345
-
MMBtu
|
|
04 | 2.2136: Install / repair insulation on steam lines | $2,960 | $528 | - |
$2,960
-
MMBtu
|
|
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $20,085 | $6,000 |
$20,085
371,630
kWh
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $12,577 | - |
$12,577
232,708
kWh
|
- | |
TOTAL RECOMMENDED | $68,298 | $29,828 |
$37,715
697,832
kWh
|
$30,583
-
MMBtu
|
||
TOTAL IMPLEMENTED | $68,298 | $29,828 |
$37,715
697,832
kWh
|
$30,583
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs