Assessment Year 1985
Principal Product VALVES
NAICS
n/a
SIC 3494: Valves and Pipe Fittings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area
n/a
Annual Production 1,200,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,054 490,914
kWh
Fuel Oil #2 $5,068 700
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,752 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,534

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,317 $500 $2,317
30,774
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $940 $277 $940
12,603
kWh
-
03 2.7243: Improve air circulation with destratification fans / other methods $218 $585 $(-32.0)
(-293)
kWh
$250
-
MMBtu
04 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $277 $150 $277
3,810
kWh
-
TOTAL RECOMMENDED $3,752 $1,512 $3,502
46,894
kWh
$250
-
MMBtu
TOTAL IMPLEMENTED $3,534 $927 $3,534
47,187
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs