ITAC Assessment: GT0242
ITAC logo
ITAC Assessment: GT0242
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product RAILCARS
NAICS
n/a
SIC 3743: Railroad Equipment
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area
n/a
Annual Production 500
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $112,417 1,737,984
kWh
Natural Gas $7,878 1,750
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,221 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $780 $20,000 - $780
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $380 $175 $380
5,862
kWh
-
03 2.4133: Use most efficient type of electric motors $238 $373 $238
3,810
kWh
-
04 2.7224: Reduce space conditioning during non-working hours $500 - - $500
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $243 $251 $243
3,810
kWh
-
06 2.7121: Utilize daylight whenever possible in lieu of artificial light $910 $50 $910
14,654
kWh
-
07 2.6212: Turn off equipment during breaks, reduce operating time $2,280 - $2,280
35,170
kWh
-
08 2.3191: Use demand controller or load shedder $7,890 $5,000 $7,890
-
kWh
-
TOTAL RECOMMENDED $13,221 $25,849 $11,941
63,306
kWh
$1,280
-
MMBtu
TOTAL IMPLEMENTED - - - -