ITAC Assessment: GT0235
ITAC logo
ITAC Assessment: GT0235
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product FABRICATED STEEL
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,295
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $18,342 198,124
kWh
Natural Gas $4,440 791
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,146 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,146

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,170 $250 $1,170
12,896
kWh
02 2.4133: Use most efficient type of electric motors $136 $473 $136
1,465
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $840 $1,100 $840
7,913
kWh
TOTAL RECOMMENDED $2,146 $1,823 $2,146
22,274
kWh
TOTAL IMPLEMENTED $2,146 $1,823 $2,146
22,274
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs