ITAC Assessment: GT0225
ITAC logo
ITAC Assessment: GT0225
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product YARNS & TWINES
NAICS
n/a
SIC 2281: Yarn Spinning Mills
Sales Range $10
M
to 50
M
# of Employees 215
Plant Area
n/a
Annual Production 6,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $238,073 4,711,899
kWh
Natural Gas $17,992 3,100
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,243 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,523

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3191: Use demand controller or load shedder $12,518 $12,000 $12,518
-
kWh
-
02 2.4133: Use most efficient type of electric motors $2,575 $2,442 $2,575
50,996
kWh
-
03 2.2711: Utilize outside air instead of conditioned air for drying $1,720 $4,000 $1,720
69,754
kWh
-
04 2.7261: Install timers and/or thermostats $730 $1,500 - $730
-
MMBtu
05 2.7492: Use proper thickness of insulation on building envelope $4,700 $18,800 $4,082
81,770
kWh
$618
-
MMBtu
TOTAL RECOMMENDED $22,243 $38,742 $20,895
202,520
kWh
$1,348
-
MMBtu
TOTAL IMPLEMENTED $20,523 $34,742 $19,175
132,766
kWh
$1,348
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs