Assessment Year | 1983 |
---|---|
Principal Product | CARPET |
NAICS |
n/a
|
SIC | 2273: Carpets and Rugs |
Sales Range | $50 M to 100M |
# of Employees | 300 |
Plant Area |
n/a
|
Annual Production | 28,800
thousand feet
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $243,042 | 4,116,940 |
kWh
|
$0.059 |
Natural Gas | $885,248 | 192,912 |
MMBtu
|
$4.59 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $240,455 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $240,455 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $15,132 | $500 | - |
$15,132
-
MMBtu
|
|
02 | 2.2414: Use waste heat from hot flue gases to preheat | $28,745 | $50,000 | - |
$28,745
-
MMBtu
|
|
03 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $22,837 | $10,000 | - |
$22,837
-
MMBtu
|
|
04 | 2.5191: Modify dye beck | $58,597 | $101,000 | - |
$58,597
-
MMBtu
|
|
05 | 2.5191: Modify dye beck | $38,740 | $51,000 | - |
$38,740
-
MMBtu
|
|
06 | 2.5192: Modify textile dryers | $33,809 | $35,000 | - |
$33,809
-
MMBtu
|
|
07 | 2.1111: Control pressure on steamer operations | $7,770 | $3,500 | - |
$7,770
-
MMBtu
|
|
08 | 2.2135: Repair and eliminate steam leaks | $4,897 | $400 | - |
$4,897
-
MMBtu
|
|
09 | 2.7492: Use proper thickness of insulation on building envelope | $2,028 | $4,000 |
$1,059
20,223
kWh
|
$969
-
MMBtu
|
|
10 | 2.3191: Use demand controller or load shedder | $27,900 | $50,000 |
$27,900
-
kWh
|
- | |
TOTAL RECOMMENDED | $240,455 | $305,400 |
$28,959
20,223
kWh
|
$211,496
-
MMBtu
|
||
TOTAL IMPLEMENTED | $240,455 | $305,400 |
$28,959
20,223
kWh
|
$211,496
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs