ITAC Assessment: GT0199
ITAC logo
ITAC Assessment: GT0199
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product ACTION APPAREL
NAICS
n/a
SIC 2399: Fabricated Textile Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 147
Plant Area
n/a
Annual Production 140,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,803 347,890
kWh
LPG $27,914 3,572
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,599 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,450

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.2443: Re-use or recycle hot or cold process exhaust air $4,320 $6,100 - $4,320
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,149 $2,491 $1,149
16,706
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $130 $75 $130
2,052
kWh
-
TOTAL RECOMMENDED $5,599 $8,666 $1,279
18,758
kWh
$4,320
-
MMBtu
TOTAL IMPLEMENTED $4,450 $6,175 $130
2,052
kWh
$4,320
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs