ITAC Assessment: GT0191
ITAC logo
ITAC Assessment: GT0191
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product CARPET TILES
NAICS
n/a
SIC 2399: Fabricated Textile Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area
n/a
Annual Production 3,600,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $327,642 8,283,412
kWh
Natural Gas $80,365 13,870
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,527 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,700

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,680 $8,960 $3,680
93,200
kWh
-
02 2.3191: Use demand controller or load shedder $6,513 $9,000 $6,513
-
kWh
-
03 2.7229: Air condition only space necessary $1,040 $400 $1,040
26,377
kWh
-
04 2.4133: Use most efficient type of electric motors $1,357 $7,400 $1,357
34,291
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,237 $2,380 $1,237
31,360
kWh
-
06 2.2414: Use waste heat from hot flue gases to preheat $2,700 $4,500 - $2,700
-
MMBtu
TOTAL RECOMMENDED $16,527 $32,640 $13,827
185,228
kWh
$2,700
-
MMBtu
TOTAL IMPLEMENTED $2,700 $4,500 - $2,700
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs