| Assessment Year | 2010 |
|---|---|
| Principal Product | Insulators |
| NAICS | 327110: Pottery, Ceramics, and Plumbing Fixture Manufacturing |
| SIC | 3264: Porcelain Electrical Supplies |
| Sales Range | $10 M to 50M |
| # of Employees | 168 |
| Plant Area |
486,662
ft2
|
| Annual Production | 2,000,000
pieces
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $840,159 | 13,499,331 |
kWh
|
$0.062 |
| Electricity Demand | $293,468 | 29,158 |
kW-mo/yr
|
$10.06 |
| Electricity Fees | $19,016 | - |
|
- |
| Natural Gas | $2,687,844 | 298,669 |
MMBtu
|
$9.00 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $155,520 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,601 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $22,577 | - | - | - | - |
$22,577
-
MMBtu
|
|
| 02 | 2.2135: Repair and eliminate steam leaks | $4,309 | $46 | - | - | - |
$4,309
-
MMBtu
|
|
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,292 | $962 | - | - | - |
$3,292
-
MMBtu
|
|
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,754 | $5,714 |
$5,754
84,622
kWh
|
- | - | - | |
| 05 | 2.6211: Conserve energy by efficient use of vending machines | $274 | $560 |
$274
4,036
kWh
|
- | - | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $35,377 | $81,156 |
$26,379
387,920
kWh
|
$8,998
-
kW-mo/yr
|
- | - | |
| 07 | 2.2437: Recover waste heat from equipment | $57,316 | $175,000 |
$47,654
700,800
kWh
|
$9,662
-
kW-mo/yr
|
- | - | |
| 08 | 2.3212: Optimize plant power factor | $12,124 | $37,200 | - | - | $12,124 | - | |
| 09 | 2.2414: Use waste heat from hot flue gases to preheat | $7,849 | $24,883 | - | - | - |
$7,849
-
MMBtu
|
|
| 10 | 2.1211: Move boiler to more efficient location | $6,648 | $60,575 | - | - | - |
$6,648
-
MMBtu
|
|
| TOTAL RECOMMENDED | $155,520 | $386,096 |
$80,061
1,177,378
kWh
|
$18,660
-
kW-mo/yr
|
$12,124 |
$44,675
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $7,601 | $1,008 | - | - | - |
$7,601
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs