ITAC Assessment: GT0182
ITAC logo
ITAC Assessment: GT0182
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product MATTRESSES, BOX SPRINGS
NAICS
n/a
SIC 2515: Mattresses, Foundations, and Convertible Beds
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area
n/a
Annual Production 190,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $189,571 2,870,457
kWh
Natural Gas $64,098 13,700
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,310 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,190 $800 $4,190
63,306
kWh
-
02 2.2711: Utilize outside air instead of conditioned air for drying $910 $1,000 - $910
-
MMBtu
03 2.2522: Isolate hot or cold equipment $2,780 $1,520 - $2,780
-
MMBtu
04 2.3191: Use demand controller or load shedder $2,200 $7,000 $2,200
-
kWh
-
05 2.4133: Use most efficient type of electric motors $1,230 $8,940 $1,230
18,757
kWh
-
TOTAL RECOMMENDED $11,310 $19,260 $7,620
82,063
kWh
$3,690
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs