ITAC Assessment: GT0176
ITAC logo
ITAC Assessment: GT0176
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product KNIT SPORTSWEAR
NAICS
n/a
SIC 2252: Hosiery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 750
Plant Area
n/a
Annual Production 750,000
pieces
Production Hrs. Annual 2,200
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,844 1,179,074
kWh
Natural Gas $28,797 6,057
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,487 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7492: Use proper thickness of insulation on building envelope $11,340 $49,800 $9,480
167,057
kWh
$1,860
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,115 $9,830 $4,115
72,685
kWh
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $928 $500 - $928
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $698 $50 $698
12,309
kWh
-
05 2.4133: Use most efficient type of electric motors $293 $624 $293
5,275
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $113 $250 $113
2,052
kWh
-
TOTAL RECOMMENDED $17,487 $61,054 $14,699
259,378
kWh
$2,788
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs