ITAC Assessment: GT0165
ITAC logo
ITAC Assessment: GT0165
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product TUFTED CARPETS
NAICS
n/a
SIC 2273: Carpets and Rugs
Sales Range $10
M
to 50
M
# of Employees 417
Plant Area
n/a
Annual Production 45,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $286,939 7,188,453
kWh
Natural Gas $431,731 98,770
MMBtu
LPG $86,240 14,885
MMBtu
Fuel Oil #6 $10,290 2,318
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $68,546 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $19,020 $50 - $19,020
-
MMBtu
02 2.5191: Modify dye beck $13,400 - - $13,400
-
MMBtu
03 2.5192: Modify textile dryers $14,070 - - $14,070
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,250 $3,560 $1,250
31,360
kWh
-
05 2.4133: Use most efficient type of electric motors $13,160 $69,135 $13,160
330,012
kWh
-
06 2.3191: Use demand controller or load shedder $7,646 $9,000 $7,646
-
kWh
-
TOTAL RECOMMENDED $68,546 $81,745 $22,056
361,372
kWh
$46,490
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs