ITAC Assessment: AM0729
ITAC logo
ITAC Assessment: AM0729
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Mechanical cable controls and pedals for industrial applications
NAICS 335314: Relay and Industrial Control Manufacturing
SIC 3625: Relays and Industrial Controls
Sales Range $10
M
to 50
M
# of Employees 109
Plant Area 78,000
ft2
Annual Production 12,000,000
pieces
Production Hrs. Annual 2,008
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $88,082 1,659,146
kWh
Electricity Demand $57,438 5,093
kW-mo/yr
Electricity Fees $3,825 -
Natural Gas $1,824 282
MMBtu
TOTAL YEARLY COSTS $151,169
RECOMMENDED SAVINGS* $28,635 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,865

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 3.5212: Regrind, reuse, or sell scrap plastic parts $6,900 - - - $6,900
-
lb
02 2.7142: Utilize higher efficiency lamps and/or ballasts $10,965 $28,840 $4,815
96,300
kWh
$6,150
-
kW-mo/yr
-
03 2.3212: Optimize plant power factor $3,490 $3,740 - $3,490
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,930 $1,000 $1,200
24,100
kWh
$1,730
-
kW-mo/yr
-
05 2.2511: Insulate bare equipment $3,770 $1,000 $1,540
30,800
kWh
$2,230
-
kW-mo/yr
-
06 2.7135: Install occupancy sensors $580 $220 $580
11,675
kWh
- -
TOTAL RECOMMENDED $28,635 $34,800 $8,135
162,875
kWh
$13,600
-
kW-mo/yr
$6,900
-
lb
TOTAL IMPLEMENTED $24,865 $33,800 $6,595
132,075
kWh
$11,370
-
kW-mo/yr
$6,900
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs