ITAC Assessment: GT0161
ITAC logo
ITAC Assessment: GT0161
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product DAIRY PRODUCTS
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 242
Plant Area
n/a
Annual Production 15,000
Tgal
Production Hrs. Annual 4,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $292,095 6,544,256
kWh
Natural Gas $124,586 31,439
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,280 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2694: Use highest temperature for chilling or cold storage $10,509 - $10,509
448,417
kWh
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $7,694 $100 - $7,694
-
MMBtu
03 2.2437: Recover waste heat from equipment $12,395 $27,500 - $12,395
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,407 $17,255 $3,407
76,495
kWh
-
05 2.4133: Use most efficient type of electric motors $6,275 $29,686 $6,275
140,973
kWh
-
TOTAL RECOMMENDED $40,280 $74,541 $20,191
665,885
kWh
$20,089
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs