ITAC Assessment: GT0154
ITAC logo
ITAC Assessment: GT0154
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product CANNED PIMENTOS, BEANS
NAICS
n/a
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $10
M
to 50
M
# of Employees 375
Plant Area
n/a
Annual Production 1,500,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,978 2,674,091
kWh
Natural Gas $325,253 91,270
MMBtu
Fuel Oil #2 $23,999 3,709
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,135 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $383 $881 $383
11,723
kWh
- -
02 2.2136: Install / repair insulation on steam lines $741 $618 - $741
-
MMBtu
-
03 2.4133: Use most efficient type of electric motors $3,641 $102,476 $3,641
110,492
kWh
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $18,522 $500 - $17,249
-
MMBtu
$1,273
-
MMBtu
05 2.1232: Keep boiler tubes clean $5,848 $5,000 - $5,447
-
MMBtu
$401
-
MMBtu
TOTAL RECOMMENDED $29,135 $109,475 $4,024
122,215
kWh
$23,437
-
MMBtu
$1,674
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs