| Assessment Year | 1982 |
|---|---|
| Principal Product | SYNTHETIC CARPET YARNS |
| NAICS |
n/a
|
| SIC | 2281: Yarn Spinning Mills |
| Sales Range | $10 M to 50M |
| # of Employees | 450 |
| Plant Area |
n/a
|
| Annual Production | 16,600,000
lb
|
| Production Hrs. Annual | 7,200
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $624,973 | 16,742,966 |
kWh
|
$0.037 |
| Natural Gas | $247,675 | 75,976 |
MMBtu
|
$3.26 |
| Fuel Oil #6 | $92,212 | 17,738 |
MMBtu
|
$5.20 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $138,012 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $62,689 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #6 Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7226: Use computer programs to optimize hvac performance | $14,476 | $20,520 |
$14,476
650,938
kWh
|
- | - | |
| 02 | 2.7111: Reduce illumination to minimum necessary levels | $42,062 | - |
$42,062
1,127,784
kWh
|
- | - | |
| 03 | 2.1232: Keep boiler tubes clean | $20,627 | $500 | - |
$15,025
-
MMBtu
|
$5,602
-
MMBtu
|
|
| 04 | 2.5123: Reduce fluid flow rates | $6,797 | $5,000 | - |
$6,797
-
MMBtu
|
- | |
| 05 | 2.4133: Use most efficient type of electric motors | $40,030 | $29,973 |
$40,030
1,082,063
kWh
|
- | - | |
| 06 | 2.3191: Use demand controller or load shedder | $13,374 | $9,000 |
$13,374
-
kWh
|
- | - | |
| 07 | 2.2511: Insulate bare equipment | $646 | $1,609 |
$646
17,292
kWh
|
- | - | |
| TOTAL RECOMMENDED | $138,012 | $66,602 |
$110,588
2,878,077
kWh
|
$21,822
-
MMBtu
|
$5,602
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $62,689 | $500 |
$42,062
1,127,784
kWh
|
$15,025
-
MMBtu
|
$5,602
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #6 Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs