ITAC Assessment: MA0850
ITAC logo
ITAC Assessment: MA0850
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Beer
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 130,000
ft2
Annual Production 80,000
units
Production Hrs. Annual 8,304
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $258,409 1,485,900
kWh
Electricity Demand $125,240 4,366
kW-mo/yr
Electricity Fees $19,950 -
Natural Gas $82,279 7,093
MMBtu
Waste Disposal Costs
Water Usage $88,470 5,510
Tgal
Water Disposal $158,217 5,510
Tgal
TOTAL YEARLY COSTS $732,565
RECOMMENDED SAVINGS* $212,859 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,844

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.9114: Use solar heat to make electricty $178,027 $784,209 $178,027
1,023,141
kWh
- - -
02 2.4322: Use or replace with energy efficient substitutes $7,420 $2,484 $6,043
34,731
kWh
$1,377
-
kW-mo/yr
- -
03 2.1233: Analyze flue gas for proper air/fuel ratio $5,634 $1,500 - - $5,634
-
MMBtu
-
04 2.8121: Apply for tax-free status for energy purchases $18,844 $1,000 - - - $18,844
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,345 $8,021 $2,345
13,478
kWh
- - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $589 $625 $474
2,723
kWh
$115
-
kW-mo/yr
- -
TOTAL RECOMMENDED $212,859 $797,839 $186,889
1,074,073
kWh
$1,492
-
kW-mo/yr
$5,634
-
MMBtu
$18,844
TOTAL IMPLEMENTED $18,844 $1,000 - - - $18,844
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs