ITAC Assessment: GT0144
ITAC logo
ITAC Assessment: GT0144
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product PORK PRODUCTS
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area
n/a
Annual Production 16,780,000
lb
Production Hrs. Annual 2,080
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $191,425 4,340,856
kWh
Natural Gas $129,040 30,952
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,291 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $919 $40 - $919
-
MMBtu
02 2.2122: Install / repair insulation on condensate lines $292 $85 - $292
-
MMBtu
03 2.2135: Repair and eliminate steam leaks $1,970 $30 - $1,970
-
MMBtu
04 2.2135: Repair and eliminate steam leaks $234 $150 - $234
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,316 $1,320 $1,316
29,894
kWh
-
06 2.3191: Use demand controller or load shedder $4,560 $9,000 $4,560
-
kWh
-
TOTAL RECOMMENDED $9,291 $10,625 $5,876
29,894
kWh
$3,415
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs